145 Production Station

Route diagram is an approximation of the actual route. Please report any inaccuracies.

Service information

Part of route 145 — SFU / Production Station.

WeekdaySaturdaySunday & Holiday

Effective from 2021-01-04 to 2021-04-11.

Download the official route diagram.

Get the timetable for this route.

This trip terminates at Production Way Station: a bus interchange.

Route summary

145 Production Station departs from SFU Transit Exchange @ en route to Production Way Station Loop @ via Tower Rd @ University High St, S Campus Rd @ Science Rd, SFU Transportation Centre @, University Dr W @ W Campus Rd, Lougheed Highway @ Gaglardi Way, and Lougheed Highway @ Production Way.